From 2003 to 2017 specialists of NEM JSC completed following projects:
• Rehabilitation of spillway at HPP-13 Tulomsky and Serebryansky Cascade HPPs TGC-1 JSC (preliminary work, construction, erection and commissioning work)
– in progress.
• Overhaul of unit #1 at HPP-9 Nivsky Cascade HPPs TGC-1 PJSC. – in progress.
• Overhaul of unit #2 at HPP-16 Tulomsky and Serebryansky Cascade HPPs TGC-1 PJSC. – in progress.
• Maintenance of unit #1 at HPP-16 Tulomsky and Serebryansky Cascade HPPs
TGC-1 PJSC.
• Overhaul of unit #3 at HPP-3 Nivsky Cascade HPPs TGC-1 PJSC.Overhaul of unit #1 at HPP-15 Tulomsky and Serebryansky Cascade HPPs TGC-1 PJSC.
• Maintenance of unit #1 at HPP-18 Tulomsky and Serebryansky Cascade HPPs
TGC-1 PJSC.
• Maintenance of unit #1 at HPP-15, 16 Tulomsky and Serebryansky Cascade HPPs
TGC-1 PJSC.
• Manufacturing and supply of spare parts for hydroelectric turbine type ÏË-80/642Ó.
• Supervise turbine’s equipment installation of unit #4 at Jebba HPP (Nigeria) for
Andritz Hydro.
• Supervise welding repair works on runner’s hub of unit #4 at Jebba HPP (Nigeria) for
Andritz Hydro.
• Manufacturing and supply of stator wedges for HPP-12 Tulomsky and Serebryansky Cascade HPPs TGC-1 PJSC.
• Repair of bottom spillways’ trash racks at HPP-11 Nivsky Cascade HPPs
TGC-1 PJSC.
• Overhaul of air distribution system at substation SS-87 switchyard-150kV for Central electrical networks KOLENERGO PJSC.
• Replacing of head-pond stop logs at HPP-2 Nivsky Cascade HPPs TGC-1 PJSC (incl. survey, design, preparation, construction and installation works, commissioning).
• Manufacturing and supply of runner’s chamber screw jacks for Kaplan turbine type
Ê91-ÂÁ-800.
• Overhaul of unit #2 at HPP-13 Tulomsky Cascade HPPs TGC-1 PJSC.
• Maintenance of unit #1 at HPP-15, 16 Serebryansky Cascade HPPs TGC-1 PJSC.
• Repair of generator’s bearings oil coolers of unit #2 at HPP-3 Nivsky Cascade HPPs TGC-1 PJSC.
• Repair of downstream pool trestle’s mechanical equipment at HPP-19 Serebryansky Cascade HPPs TGC-1 PJSC.
• Rehabilitation (incl. survey, design, preparation, construction and installation works, commissioning) of hydromechanical equipment of intake water facilities at unit #4 HPP-2 Nivsky Cascade HPPs TGC-1 PJSC.
• Overhaul of transformer AT-1 at Apatitskaya CHP.
• Repair of main butterfly valve of unit #1 at HPP-18 Serebryansky Cascade HPPs TGC-1 JSC.
• Manufacturing and installation of two metal frames for hydrometric propellers fixing for unit #1 at HPP-10 Nivsky Cascade HPPs TGC-1 JSC. Operating with it during by the absolute method energy tests.
• Vibration monitoring of synchronous condenser #2 at substation SS-20A for Northern electrical networks KOLENERGO PJSC.
• Manufacturing and supply of spare parts for hydroelectric generator type
ÑÂ 640/170-24.
• Manufacturing and supply of spare parts for hydroelectric turbine type
ÏË-20/661-Â-500.
• Overhaul of air distribution system at substation SS-87 switchyard-150kV for Central electrical networks KOLENERGO PJSC.
• Design of a fast shutter’s (with rope mechanism) and trash rack’s heated upper sections program and test methodology for Vuoksa Cascade HPPs TGC-1 JSC. Carrying out of energy tests with the Customer.
• Stator winding repair of synchronous condenser #1 at substation SS-20A for Northern electrical networks KOLENERGO PJSC.
• Rehabilitation of hydraulic turbines (2 units) with replacement of runners (design, manufacturing, supply and replacement of hydraulic turbine runners, speed governor and APCS) at HHP-10 Nivsky Cascade HPPs TGC-1 JSC with ANDRITZ HYDRO.
• Rehabilitation of thrust bearing with replacement of segments coating on PTFE at unit #2 HPP-7 Pazsky Cascade HPPs TGC-1 JSC.
• Rehabilitation (incl. survey, design, preparation, construction and installation works, commissioning) of hydromechanical equipment of intake water facilities at unit #1 HPP-2 Nivsky Cascade HPPs TGC-1 JSC.
• Vibration monitoring of penstock at units #2, #3 HPP-2 Nivsky Cascade HPPs TGC-1 JSC.
• Overhaul of transformer T-1 (type ÒÄÃ-70000/150) at substation SS-11A.
• Overhaul and corrosion protection coating of spillway gates at Pirenga water regulating facilities.
• Vibration monitoring of penstock at unit #2 HPP-15 Serebryansky Cascade HPPs TGC-1 JSC.
• Renovation of portals metal structures and foundation at substation SS-11A switchyard-150 kV.
• Renovation of spillway gate concrete at HPP-5 Pazsky Cascade HPPs TGC-1 JSC (underwater operations).
• Overhaul of transformer #2 at Apatitskaya CHP.
• Repairs of HPP plant equipment at HPP-15, 16 Serebryansky Cascade HPPs TGC-1 JSC.
• Maintenance of unit #1 HPP-18 Tulomsky Cascade HPPs TGC-1 JSC.
• Repair of electric equipment at HPP-15, 16 switchyards-150 (35kV)
Serebryansky Cascade HPPs TGC-1 JSC.
• Overhaul of two single-tank oil circuit breakers (type ÂÌÒ-150) at HPP-18, 19 switchyards Serebryansky Cascade HPPs TGC-1 JSC.
• Repair and corrosion protection coating of portal metal structures at HPP-15, 16, 18, 19 switchyards Serebryansky Cascade HPPs TGC-1 JSC.
• Manufacturing of set of runner blades sealings for unit #1 HPP-1 Nivsky
Cascade HPPs TGC-1 JSC.
• Manufacturing and supply of spillway bulkhead at HPP-12 Tulomsky Cascade HPPs TGC-1 JSC.
• Repairs of turbine bearings segments at HPP-7, 8 Pazsky Cascade HPPs TGC-1 JSC.
• Repairs of thrust bearing segments at unit #1 HPP-11 Nivsky Cascade HPPs
TGC-1 JSC.
• Repair of transformer AÒ-1 at HPP-15 Serebryansky Cascade HPPs TGC-1 JSC.
• Overhaul of transformer AÒ-2 at Ondskaya HPP Vygsky Cascade HPPs
TGC-1 JSC.
• Overhaul of unit #2 at HPP-19 Serebryansky Cascade HPPs TGC-1 JSC.
• Overhaul of unit #3 at HPP-15 Serebryansky Cascade HPPs TGC-1 JSC.
• Overhaul and corrosion protection coating of intake unit bulkhead at HPP-18 Serebryansky Cascade HPPs TGC-1 JSC.
• Overhaul and corrosion protection coating of fast shutters and trash racks at
unit #3 HPP-15 Serebryansky Cascade HPPs TGC-1 JSC.
• Overhaul of transformer Ò-1 at HPP-16 Serebryansky Cascade HPPs TGC-1 JSC.
• Maintenance of unit #2 at HPP-13 Tulomsky Cascade HPPs TGC-1 JSC.
• Replacement of draft tubes stop log at HPP-3 Nivsky Cascade HPPs TGC-1 JSC.
• Overhaul of unit #1 at HPP-11 Nivsky Cascade HPPs TGC-1 JSC.
• Rehabilitation of hydromechanical equipment at HPP-2 Nivsky Cascade HPPs TGC-1 JSC.
• Overhaul of transformer Ò-2 at HPP-13 Tulomsky Cascade HPPs TGC-1 JSC.
• Overhaul and corrosion protection coating of fast shutters and trash racks at
unit #4 HPP-13 Tulomsky Cascade HPPs TGC-1 JSC.
• Overhaul and corrosion protection coating of fast shutters and trash racks at
unit #2 HPP-13 Tulomsky Cascade HPPs TGC-1 JSC.
• Corrosion protection coating of trash racks at unit #2 HPP-13 Tulomsky
Cascade HPPs TGC-1 JSC.
• Overhaul and corrosion protection coating of fast shutters and trash racks at
unit #2 HPP-12 Tulomsky Cascade HPPs TGC-1 JSC.
• Corrosion protection coating of operational spillway gates (#1, #2, #3) inner surfaces at HPP-13 Tulomsky Cascade HPPs TGC-1 JSC.
• Corrosion protection coating of fast shutters hydraulic cylinders at HPP-12 Tulomsky Cascade HPPs TGC-1 JSC.
• Overhaul and corrosion protection coating of bulkhead at unit #2 HPP-16 Serebryansky Cascade HPPs TGC-1 JSC.
• Overhaul and corrosion protection coating of bulkhead at unit #2 HPP-15 Serebryansky Cascade HPPs TGC-1 JSC.
• Overhaul of intake unit bulkhead at unit #1 HPP-15 Serebryansky Cascade HPPs TGC-1 JSC.
• Overhaul and corrosion protection coating of fast shutters and trash racks at unit #1 HPP-15 Serebryansky Cascade HPPs TGC-1 JSC.
• Overhaul of bulkhead at unit #1 HPP-16 Serebryansky Cascade HPPs TGC-1 JSC.
• Overhaul and corrosion protection coating of fast shutters and trash racks at unit #3 HPP-15 Serebryansky Cascade HPPs TGC-1 JSC.
• Survey and design of estimate documentation of trash racks replacement at HPP-1 Nivsky Cascade HPPs TGC-1 JSC.
• Survey of fast shutters at unit #1HPP-1 Nivsky Cascade HPPs TGC-1 JSC.
• Design of estimate documentation of water regulating facilities hydraulic equipment rehabilitation for HPP-2 Nivsky Cascade HPPs TGC-1 JSC.
• Survey of trash racks at unit #3 HPP-2 Nivsky Cascade HPPs TGC-1 JSC.
• Overhaul and corrosion protection coating of fast shutters and trash racks at unit #2 HPP-11 Nivsky Cascade HPPs TGC-1 JSC.
• “Turnkey” rehabilitation of hydromechanical equipment at HPP-1 Nivsky Cascade HPPs TGC-1 JSC.
• Overhaul and corrosion protection coating of fast shutters and trash racks at unit #1 HPP-3 Nivsky Cascade HPPs TGC-1 JSC.
• Repair of head-pond stop logs at HPP-1 Nivsky Cascade HPPs TGC-1 JSC.
• Overhaul of ground gate at HPP-1 Nivsky Cascade HPPs TGC-1 JSC.
• 100% corrosion protection coating of two penstocks outer surface at HPP-2
Nivsky Cascade HPPs TGC-1 JSC.
• Repair of trash racks lift rods at HPP-10 Nivsky Cascade HPPs TGC-1 JSC.
• Refurbishment of ground gate at HPP-1 Nivsky Cascade HPPs TGC-1 JSC.
• Project design for mechanical equipment rehabilitation at HPP-1 Nivsky
Cascade HPPs TGC-1 JSC.
• Corrosion protection coating of head-pond stop logs at HPP-2 Nivsky Cascade HPPs TGC-1 JSC.
• Rehabilitation of spillway mechanical equipment at HPP-2 Nivsky Cascade HPPs TGC-1 JSC.
• Corrosion protection coating of downstream bulkhead gates at HPP-2 Nivsky
Cascade HPPs TGC-1 JSC.
• Manufacturing, transportation and installation of docking port for
Mezenskaya TPP.
• Manufacturing and supply of mobile sanitary inspection room to ensure sanitary and hygienic mode of operation for Federal state unitary enterprise “Northern federal enterprise for radioactive waste management”.
• Manufacturing of two LRW tanks (V=4m3) for Federal state unitary enterprise “Northern federal enterprise for radioactive waste management”.
• Design, manufacturing and installation of receivers insulated pads at HPP-4 and
HPP-8 Pazsky Cascade HPPs TGC-1 JSC with polyurethane foam spraying.
• Overhaul of transformers (type ÒÐÄÍ-40000/150; ÒÄÒÍ-16000/150;
ÀÒÄÒÃ-90000/150/110; ÒÄÒÍ-63000/150) at Substations SS-20, SS-20À, SS-51 for Northern electrical networks KOLENERGO JSC
• Overhaul at unit #2, #3, #4 HPP-12, Tulomsky Cascade HPPs TGC-1 JSC.
• Overhaul at unit #1, #2, #3 HPP-13, Tulomsky Cascade HPPs TGC-1 JSC.
• Overhaul at units #1, #2 HPP-8, Pazsky Cascade HPPs TGC-1 JSC.
• Overhaul at unit #1 HPP-7, Pazsky Cascade HPPs TGC-1 JSC.
• Overhaul at units #1, #2 HPP-5, Pazskysky Cascade HPPs TGC-1 JSC.
• Overhaul at unit #1 HPP-4, Pazsky Cascade HPPs TGC-1 JSC.
• Overhaul at units #1, #2, #3, #4 HPP-2, Nivsky Cascade HPPs TGC-1 JSC.
• Overhaul at units #1, #2 HPP-10, Nivsky Cascade HPPs TGC-1 JSC.
• Overhaul at unit #1 HPP-9, Nivsky Cascade HPPs TGC-1 JSC.
• Overhaul at unit #2 HPP-19, Serebryansky Cascade HPPs TGC-1 JSC.
• Overhaul at unit #1 HPP-18, Serebryansky Cascade HPPs TGC-1 JSC.
• Overhaul at units #1, #2, #3 HPP-15, Serebryansky Cascade HPPs TGC-1 JSC.
• Overhaul at unit #2 HPP-16, Serebryansky Cascade HPPs TGC-1 JSC.
• Rehabilitations with turbines replacement at units #1, #2, #3 HPP-16, Serebryansky Cascade HPPs TGC-1 JSC.
• Rehabilitations with turbines replacement at units #1, #2, #3 HPP-15, Serebryansky Cascade HPPs TGC-1 JSC.
• Manufacturing, installation, corrosion protection coating and overhaul of linear and sectional portals metal structures at Substations SS-20À, SS-51, SS-6, SS-53, SS-325 for Northern electrical networks KOLENERGO JSC.
• Corrosion protection coating of draft tubes valves, spillway and intake unit at HPP-12, HPP-13, metal structures of gantry crane, pier and gates at Kislogubskaya TPP Tulomsky Cascade HPPs TGC-1 JSC, HPP-4, 5, 6, 7 Pazsky Cascade HPPs TGC-1 JSC with coating “Galopolim”, penstock, metal structures of spillway, gantry cranes and gates at HPP-18, 19 Serebryansky Cascade HPPs TGC-1 JSC with coating “Stelpant”, metal structures of gates and intake unit at HPP-9, gates at Lyahkominsky waterworks Nivsky Cascade HPPs TGC-1 JSC with coating “Vinicolor”.
• Manufacturing of building metal structures, containers of clean water and decontamination water for temporary equipment and vehicles decontamination area in Bay Andreeva.
• Manufacturing with fit-up of air separation boards for unit #2 HPP-15 Serebryansky Cascade HPPs TGC-1 JSC.
• Manufacturing, extension and installation of warehouse metal parts for joint Russian-Finnish company “Koltak”.
• Manufacturing and installation of crane runaway metal structures of suspended mast crane at the East heating boiler house, the South heating boiler house, Murmanskaya CHP, Ship repair yards #96 Navy Federal State Unitary Enterprise.
|