Home Search Contact Us            russian version

News


October 01, 2018
The team of specialists of CJSC NEM started the repair and anticorrosion protection of the hydromechanical equipment of the water intake of the Nizhne-Teriberskaya hydroelectric station.
Read more...

September 17, 2018
Specialists of CJSC NEM started the overhaul of the hydraulic unit of the Nizhne-Svirskaya hydroelectric power station.
Read more...

August 1, 2018
Work continues on the reconstruction of spillway of Nizhnetulomskaya HPP.
Read more...

March 30, 2009

During carrying out of repair of the hydrounit  No 2 on Serebryansk Hydro power station, critical defect of the driving wheel  is revealed (the case of a spherical support of a stone of rocker mechanism has cracked ).

If such defect has not been found out in time, at the further operation of the hydrounit there would be a failurе  as a result of which financial losses would be estimated a lots of millions of roubles.

Now our experts together with representatives of a factory of the manufacturer of the hydrounit conduct full disassembly of a wheel for revealing the reasons of failure of the above details and in parallel there is a search of a factory capable to manufacturing broken details.

The problem considerably becomes complicated still that driving wheels GES-15 and 16 of Serebryansk cascade are unique since it is more anywhere in the world hydrounits with similar mechanisms on turbines are not used at such big pressures of water.

The decision of this problem will undoubtedly lead to increase in terms and cost of repair of the hydrounit, but  will reduce probability of emergencies in the future and will make operation of the hydrounit  more reliable of course.

 

Portfolio

 

хостинг от .masterhost